Why Pre-Fabricated Structures

Reduced Construction Time

The use of high strength steel, tapered built-up sections which are optimized by the computerized design program and the use of continuous light gage secondary steel section leads to overall reduction in steel weight, cost and time relative to conventional steel construction.

Design

Since PEB’s are mainly formed of standard sections and connections, the design time is significantly reduced. The low-weight flexible frames offer higher resistance to seismic forces.

Lower Cost

There is a significant saving in design, manufacturing and site erection cost. The structural elements are shaped to follow the stress diagram of the member, thus reducing weight, cost and load to foundations. The secondary membersand cladding nest together reducing transportation cost. The overall price per square meter may be reduced as much as 30% lower than conventional steel..

Foundation, Erection, Flexibility of Expansion and Large Clear Spans

Pre-engineered Buildings are about 30% lighter than the conventional steel structures. Hence, the foundations are of simple design, easy to construct and lighter weights. Also, Since all the connections of the different components are standard, the erection time is faster.Buildings can be easily expanded in length by adding additional bays. Also, expansion in width and height is possible by pre-designing for future expansion.Buildings can be supplied to around 90M clear spans..

Quality Control and Low Maintenance

As buildings are manufactured completely in the factory under controlled conditions, the quality is assured.Buildings are supplied with high quality paint systems for cladding and steel to suit ambient conditions at site, which results in long durability and low maintenance costs..

Energy Efficient Roof and Wall Systems

Buildings can be supplied with polyurethane insulated panels or fibreglass blanket insulation to achieve required ‘U’ values..

Architectural Versatility and Single Source Responsibility

Buildings can be supplied with various types of fascias, canopies, and curved eaves and designed to receive pre-cast concrete wall panels, curtain walls, block walls and other wall systems.As the complete building package is supplied by a single vendor .

<